For the ones who build it all.

Built for the Field.
Every dollar.
Accounted for.

Dyrtex is a fully linked estimating platform built for heavy civil contractors. Build out every line item — labor, materials by pit, and trucking cycles — and see the real cost before you submit.

Dyrtex. For the ones who build it all.

10+
Linked modules — labor, equipment, trucking, crews, materials by pit, estimate, proposal, work order
60%
Faster bid prep from start to submission
0
Broken formula links. Change one rate — fuel, labor, equipment — and everything updates.

Your bids deserve better tools.

Heavy civil contractors deserve tools built for their trade. When your estimating platform isn't purpose-built for the field, time gets wasted and margins get missed. Dyrtex was built specifically for heavy civil — every module linked, every rate live, every bid built with confidence.

Every module — from your labor burden rates to your crew matrix to your final bid proposal — links together in real time. Change your fuel price once. Everything updates automatically.

  • Crew rates, equipment, and labor all linked in one place
  • Pipe zone quantities, bedding, and backfill calculated automatically on every bid
  • Work orders generated directly from your estimate hours — no manual entry
  • Full line item cost breakdown — trucking, materials, and labor separated and clear
Dyrtex · Live Estimate
Description
QTY
$/HR
Total
Mass Excavation
12400
=Labor!D9
$42,130
8" Storm Drain
1840
=Deere!H9+
$18,240
Trench Backfill
1840
301.64
??? copied?
Asphalt Paving
4200
142.44
598,248
Pipe Zone Material
$28,175
$28,175
↑ Sound familiar? Dyrtex eliminates this.

Everything a civil contractor needs. Nothing they don't.

01
Crew Matrix Builder

Build named crews from any combination of labor roles and equipment. Dyrtex calculates the combined $/hr automatically. Assign a crew to any estimate line item in one click.

02
Live Rate Linking

Update diesel prices, labor wages, or equipment rental rates once. Every crew, every estimate line, every bid total — all recalculate instantly. Zero manual updates.

03
Line Item Buildout

Expand any line item — like 18" RCP install — to add multiple crew, material, and trucking components. All roll up into one clean line item with unit price and total cost. No more guessing what's in the number.

04
Independent Pit Pricing

Each material pit has its own pricing, tax rate, and swell factor — fully independent. Johnson Pit charges different rates than your default supplier. Dyrtex keeps them separate so nothing cross-contaminates.

05
Markup & Margin Sheet

Layer G&A overhead, contingency, escalation, bid bonds, P&P bonds, and profit margin — in the right order. See your effective markup on direct cost before you submit.

06
Work Order Generator

Convert estimated production hours to crew days automatically. Set 8-hour, 10-hour, or custom shift lengths. Hand your crew a schedule built directly from the bid.

07
Professional Bid Proposals

Generate clean, client-ready bid proposals with your company header, project scope, exclusions, and line-item totals. Exports to PDF in one click.

08
Bid Archive & History

Every bid you build is saved. Search active bids, pull archived projects, duplicate a past estimate for a similar job. Your institutional knowledge stays yours.

09
Trucking Cycle Calculator

Enter load time, dump time, travel distance, and wait time for any haul. Dyrtex calculates loads/hr, fleet production rate, and cost per unit. Add it directly to a line item buildout alongside labor and materials.

Set it up once.
Bid every project faster.

1

Build your rate sheets

Enter your labor roles and base wages — Dyrtex calculates burdened rates with your tax and fringe inputs. Add your equipment fleet with rental rates, fuel consumption, and maintenance factors. Set your material defaults by type and create pit-specific overrides.

One-time setup · Reused on every bid
2

Assemble your crews

In the Crew Matrix, drag in the labor roles and equipment that make up each named crew. Dyrtex sums them to a total crew $/hr automatically. Build as many crews as your operation runs — demolition, excavation, utility, paving, SWPPP.

Crews saved · Reused across projects
3

Estimate the project

Add scope line items by category. Use the line item buildout to attach crew hours, material quantities from specific pits, and trucking cycle times — all to a single line. Change production rate and hours link automatically. Every dollar is auditable and traceable.

Production-rate-driven · No guesswork
4

Apply markups and generate documents

Review the markup sheet — adjust overhead, bonds, contingency, and margin. Then generate your bid proposal PDF and work order schedule in a single click. Archive it when submitted. Pull it up anytime.

PDF export · Archive · Duplicate for next bid

Estimate sheet — line item buildout with crew, materials by pit, and trucking

Dyrtex · Residential Site Development · Estimating Sheet
Dashboard
Labor
Equipment
Trucking
Materials
Crew Matrix
Estimate
Markups
Proposal
Work Order
Item #
Scope Item
QTY / Unit
Components
Hours
Unit Price / Total
Earthwork
01
Mass Excavation – Cut
12,400 CY
Demo Crew · 90 CY/hr
137.8
$3.40 / $42,130
Wet Utilities
02
18" RCP Install ▼ 4 components
1,840 LF
FF Crew + Bedding + Trucking
18.4
$54.20 / $99,728
👷 FF Crew · 18.4 hrs · $36,800
⬡ 3/8" Chips · 245 TON · $28,175
⬡ Pipe Bedding Sand · 180 CY · $9,900
🚚 3 End Dumps · 25-min cycle · $24,853
03
8" Storm Drain
840 LF
FF Crew · 100 LF/hr
8.4
$36.40 / $30,576
DIRECT COST
$684,230
TOTAL HOURS
889 hrs
BID TOTAL W/ MARKUP
$812,490
See it in action

Watch a bid come together.

From blank estimate to final number — see how fast Dyrtex builds a real heavy civil bid.

Dyrtex · Ridgeline Estates Phase 2 · Estimate
SAVE
Dashboard
Estimate
Markups
Proposal
Work Order
Direct cost
$0
Total hours
0
Line items
0
Bid total
$0
1
Add line items
2
Assign crews & materials
3
Add trucking
4
See the total
Members only

Join The Dirt.

The exclusive community for Dyrtex users. Ask hard questions. Share real bid breakdowns. Learn from contractors who are winning work every day.

Discussions across 8 categories — earthwork, trucking, utilities and more
Real bid breakdowns shared by contractors in the field
Job board, templates, live events, and direct access to the Dyrtex team
Exclusive to Dyrtex subscribers — your membership is included
Enter The Dirt →
The Dirt — Community Feed
● 17 online
MT
Marcus Tingey
Earthwork · 2 hr ago
EARTHWORK
How are you handling swell factor on cut to fill?
Using the material factor field but wondering if there's a better way...
♥ 24 💬 8 replies
JR
Jake Reynolds
Wet Utilities · 4 hr ago
UTILITIES
Sharing my 18" RCP setup — $54/LF all in.
FF crew at 100 LF/hr, pipe bedding 0.18 TON/LF, backfill included...
♥ 47 💬 19 replies
RC
Ryan Castillo
Winning Bids · Yesterday
WIN
Won a $4.2M grading package — here's what our numbers looked like.
280,000 CY of mass grade, margin came in at 12.4%...
♥ 91 💬 48 replies

Simple pricing.
No implementation fees.

Starter
$79
per month · billed monthly
  • Up to 10 active bids
  • All rate sheets & crew matrix
  • Estimating sheet with live linking
  • Bid proposal PDF export
  • Bid archive & history
  • Work order generator
  • Multi-user access
  • Custom material pits & trucking
Get Started
Enterprise
Custom
contact us for a quote
  • Everything in Professional
  • Unlimited users
  • Custom scope templates
  • Onboarding & training
  • Priority support
  • API access
  • Custom integrations
  • SLA guarantee
Contact Us
"

We used to spend two full days pulling together a bid. With Dyrtex everything is linked — labor, equipment, trucking — and the numbers are always current. It changed how we bid completely.

HEAVY CIVIL ESTIMATOR
Self-performing contractor · Intermountain West

Be the first to build a better bid.

Dyrtex is in active development. Join the early access list and get founding member pricing when we launch — locked in for life.

No credit card required. No spam. We'll reach out when early access opens.